Before exploring the details of the reactor installation aft
 
Reactor in installation, operation prior to use, there are still some details that need to pay attention to these details often is more easily overlooked, facet we have to explore how these details:

1, the reaction vessel is installed, the water jacket on the oil injection. Cooling and lubricating mechanical seal and prolong life.

2 Rotate the reactor motor fan wings, no abnormal sound, flexible rotation, oil can not leak.

3, when the reactor fuel from the fuel cup filling, you can see that there is oil in the oil cup.

4, reactor test gear, we should add 46 # gasoline and oil lubrication, gear operation 20 days after the first oil change, oil change once every six months later, when the oil change play an open oil nut.

5, such as the conditions permit, the reaction vessel through the water jacket of circulating water, for cooling (in the case where the temperature is not high, can not be used), the cooling water is low prices.

6, when lifting reactor vessel lid, such as plant height is not high, the motor and gearbox can be removed

7, when removing the reactor motor, loosen the four bolts with flat wings or call methods to fight to remove. Or demolition reducer method can also reduce its height. Method is to bolt reducer loosen the bracket junction removed, and the four bolts to take down the bracket coupling together to win, after the equipment has been checked, then it is connected. Rotate the fan wings and see if rotating flexible, can be put into use after no abnormal noise (Note: To fill the oil).